This is the erected silo for the Pulliam 8 activated carbon injection (ACI) system for mercury control. The equipment visible through the ground floor doorway meters and fluidizes the carbon for transport to the injection grid.
Mezzanine level of the Pulliam 8 carbon silo – visible are 2 of the 3 chutes that feed carbon from the storage silo into the mercury control process trains.
Unloading the 48 ft tall powdered activated carbon container at the Pulliam Power Plant.