Before service and meters can be installed, the following conditions need to be met:
- A site sketch and liability waiver form
or survey map must be sent to Wisconsin Public Service.
- The construction site and building foundation must be back-filled
to within 6" of final grade.
- The service route is to be cleared 10' wide of brush, etc.
- The electric meter base must be installed.
- The gas meter location must be clearly marked.
- An inspection report from a State of Wisconsin certified electrical
inspector or a wiring compliance statement from the electrician needs to be
received by WPS.
- Easements need to be signed and on file with Wisconsin Public Service.
- All service construction charges in Wisconsin must be paid in advance
if cost is equal to or greater than $1,000. In Michigan all service construction
charges equal to or greater than $25.00 are to be paid in advance.