solar panels on roof top of a home

Systems 20kW or less

Installation steps for customer-owned generation agreements are determined by size. Systems with a capacity of 20 kilowatts (kW) or less are typical for homes and smaller businesses.

Owner and installer responsibilities

  • Design, install, operate and maintain any generation system installed.
  • Follow interconnection rules from Public Service Commission of Wisconsin (PSCW) and meet all WPS tariff requirements, applicable laws and regulations (local, state and federal).
  • Maintain liability insurance (equal to or greater than amounts indicated in PSC 119) or prove financial responsibility by another means agreeable to us.
  • Notify us if a material modification is made to the generation facility at any time during or after the installation process. Material modifications are modifications that change the maximum electrical output of a facility or change the interconnection equipment, including:
    • Changing from certified to noncertified devices.
    • Replacing a component with one of different functionality or UL listing.
  • Properly install, operate and maintain specified protective devices.
  • Obtain authorizations, permits and licenses required for construction and operation of the generating facilities at your expense.
  • Complete the steps for interconnection.

Our responsibilities

We will promptly carry out our role in the interconnection steps and meet all required timelines to process your interconnection application. We will provide you with any information you need to complete your interconnection.

Interconnection steps

These steps are required by state law to interconnect to our distribution system.

  1. Email us with questions.
  2. Review parallel generation rate.
  3. Review and understand rules and requirements.
  4. Complete and submit application (send payment separately).
    Wisconsin Standard Distributed Generation Application Form

    Application address (mail or email)
    Wisconsin Public Service
    Attn: Christine Behnke
    134 MacArthur Drive
    Coleman WI 54112
    customergen@wisconsinpublicservice.com

    Payment address
    We Energies
    Essential Services A299
    PO Box 2046
    Milwaukee, WI 53201-9627

  5. Include supplements applying for:
  6. Await application approval.
    After we receive the application, we will:
    • Review it for all required information.
    • Contact you about its status within 10 business days.
    • Request more information if application is incomplete.
    Track interconnection applications by work request number (updated monthly)
  7. Sign the interconnection and power purchase agreement.
    Must be signed by owner and our representative for operation to begin.
  8. Install parallel generation.
    • Must happen within mutually agreed upon timeframe.
    • After receipt of payment, we will perform the work to upgrade our distribution system and accommodate your generation system (if required).
  9. Commissioning system
    Email Certificate of Compliance or local inspector verification to customergen@wisconsinpublicservice.com
    We will witness or verify the system testing.
    This may include:
    • Witnessing commissioning tests.
    • Performing anti-islanding tests.
    • Verifying protective equipment settings.